|
| Hotcranes |
Cranes
| Construction |
Elevators
/ Excelerators
| |
|

|
Long-Term
investment: Because the REPL Centelift is designed and built to match heavy
designed and built to match heavy operating duties, it will continue to give
safe, reliable
service year after year.
Lasting strength and rigidity of the structure is ensured by the inherently stable
twin girder design which minimizes torsional forces.
Even acceleration, smooth starting torque and starting
current: from slipring motors which are the standard specification on all motions
hoist, cross travel and long travel.
Safe, steady, vertical lift: with even distribution of load through a minimum of four falls
of wire rope with two falls of left and right hand machined spiral groove fabricated steel
rope drum.
Sturdy reliable hoist gearbox: achieved with rigid one piece welded steel
fabrication, with
shaft bearing bosses jig bored. The Gearbox is not split along the
center line of the shafts
so more accurate alignment is achieved abd the risk of oil leaks eliminated.
Extended life: of spur and helical gears from 20 Mn Cr and pinions from high Carbon Steel.
Durable, high grade steel: double flanged forged wheels mounted on antifriction bearings in
end carriages
and crab.
Lower Operating Costs: through
simplified, minimal maintenance requirements and ease of repair
and replacement
of components.
Safe, Convenient Routine
Inspection And Maintenance :
Routine inspection and maintenance
are necessary for any lifting machinery, REPL face
the fact with thoughtful
design to make it easier and safer to maintain a Centrelift
crane.
Safe, easy access : to
long travel drive units and electrical gear from strong steel
trough walk-way with nonstick
finish and firm tubular handrails, extending full length of
crane bridge. Angled around electrical equipment to
maintain full width platform.
Convenient crab layout : provides
safe, secure platform for easy access to all crab components
including
compensating sheaves.
Easy access to the gearbox: for
inspection with effective oil seal, readily detachable without
draining.
disturbing
gears or bearings.
Safe, reliable
Festoon cable crossbridge feed system.
Test circuit: provided
in electrical panel. All electrical contactors, relays and
resistances grouped together in panels.
Ease of component replacement: achieved
by keyed shafts on all wheels, accurate jig alignment of all
major
components consistent in any replacement units supplied, coupled
shaft drive from motor to gearbox, eliminates
alignment problems. |
|

|
Longer Working Life : less
maintenance required ball or roller
bearings fitted to all gearbox shafts, cross travel and main
travel
axies. drive end of hoist drum. bottom hook, large diameter
compensating and bottom block sheaves. |
|
Cranes
| Construction |
|
|
|
Please Send
Your Enquiries to response@shreecranes.com |
|
|
|